Red Mountain Project

Alaska, USA

About the Project

Silver47’s Flagship Red Mountain Project represents a district-scale polymetallic opportunity with significant upside potential. The combination of high-grade mineralization, favorable jurisdiction and, importantly, State managed lands make the Red Mountain Project ideal for development.

The Red Mountain Project is Silver47’s most advanced project, strategically located in Alaska, 100 kilometers south of Fairbanks. This project offers a unique opportunity to explore and develop high-grade silver and critical minerals in a premier mining jurisdiction.

“The Red Mountain Project is Silver47’s flagship asset, strategically located in Alaska, 100 kilometers south of Fairbanks. This project offers a unique opportunity to explore and develop high-grade silver and critical minerals in a premier mining jurisdiction”

Galen McNamara
Silver47 CEO & Director

Project Highlights

* Equivalencies are calculated using ratios with metal prices of US$2,750/tonne Zn, US$2,100/tonne Pb, US$8,880/tonne Cu, US$1,850/oz Au, and US$23/oz Ag and recoveries of 90% Zn, 75% Pb, 70% Cu, 70% Ag, and 80% Au.
AgEq* (g/t) = [Zn (%) x 47.81] + [Pb (%) x 30.43] + [Cu (%) x 119] + [Ag (g/t) x 1] + [Au (g/t) x 91.93]

Mineral Resource Estimates

Note:

1. The 2024 Red Mountain MRE was estimated and classified in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) “Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines” dated November 29, 2019, and the CIM “Definition Standards for Mineral Resources and Mineral Reserves” dated May 10, 2014.
2. Mr. Warren Black, M.Sc., P.Geo. of APEX Geoscience Ltd., a QP as defined by NI 43-101, is responsible for completing the 2024 Mineral Resource Estimate, effective January 12, 2024.
3. Mineral resources that are not mineral reserves have not demonstrated economic viability. No mineral reserves have been calculated for Red Mountain. There is no guarantee that any part of the mineral resources discussed herein will be converted to a mineral reserve in the future.
4. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, market, or other relevant factors.
5. The quantity and grade of reported Inferred Resources is uncertain, and there has not been sufficient work to define the Inferred Mineral Resource as an Indicated or Measured Mineral Resource. It is reasonably expected that most of the Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.
6. All figures are rounded to reflect the relative accuracy of the estimates. Totals may not sum due to rounding. Reported grades are undiluted.
7. A standard density of 2.94 g/cm³ is assumed for mineralized material and waste rock. Overburden density is set at 1.8 g/cm³. For mineralized material blocks with iron assays close enough to estimate an iron value for the block, density is calculated using the formula: density (g/cm³) = 0.0553 * Fe (%) + 2.5426.
8. Metal prices are US$2,750/tonne Zn, US$2,100/tonne Pb, US$8,880/tonne Cu, US$1,850/oz Au, and US$23/oz Ag.
9. Recoveries are 90% Zn, 75% Pb, 70% Cu, 70% Ag, and 80% Au.
10. ZnEQ (%) = [Zn (%) x 1] + [Pb (%) x 0.6364] + [Cu (%) x 2.4889] + [Ag (ppm) x 0.0209] + [Au (ppm) x 0.1923]
11. AgEQ (ppm) = [Zn (%) x 47.81] + [Pb (%) x 30.43] + [Cu (%) x 119] + [Ag (ppm) x 1] + [Au (ppm) x 91.93]
12. Open-pit resource economic assumptions are US$3/tonne for mining mineralized and waste material, US$19/tonne for processing, and 48° pit slopes.
13. Underground resource economic assumptions are US$50/tonne for mining mineralized and waste material and US$19/tonne for processing.
14. Open-pit resources comprise blocks constrained by the pit shell resulting from the pseudoflow optimization using the open-pit economic assumptions.
15. Underground resources comprise blocks below the open-pit shell that form minable shapes. They must be contained in domains of a minimum width of 1.5 m at Dry Creek or 3 m height at West Tundra Flats. Resources not meeting these size criteria are included if, once diluted to the required size, maintain a grade above the cutoff.

LOCATED IN ALASKA, USA

The Red Mountain Project is situated on Alaska state-managed lands, free from Bureau of Land Management (BLM) or indigenous claims

  • Covering approximately 620 square kilometers of highly prospective geology
  • Alaska is host to several world class deposits and mines

30-80 kilometers of highways, railways, and power, ensuring logistical efficiency and reduced development costs

Numerous multi million ounce VMS and polymetalic deposits offering multi-commodity potential

OWERNSHIP

Silver47 wholly owns 942 mineral claims and one mining lease, providing extensive exploration opportunities over a 60km trend in a mining-friendly region near established infrastructure

HISTORICAL EXPLORATION

The Red Mountain Project area has a rich history of mineral exploration, with the first sulphide outcrop discovered in 1975. Ongoing exploration efforts continue to reveal the potential for further resource expansion, particularly in the Dry Creek and West Tundra Flats zones

Exploration & Development Strategy

Silver47 is focused on further exploration of the Red Mountain Project to expand the current resource base and uncover new high-grade zones. The strategy includes:

RAPID RESOURCE GROWTH

Focused on the Dry Creek and West Tundra Flats (WTF) zones

TARGETING NEW DISCOVERIES

Drilling to identify new silver-copper-gold mineralization

ADVANCING TOWARDS DEVELOPMENT

Fast-tracking the project to a development milestone and potential mine build

Dry Creek Long Section

* Equivalencies are calculated using ratios with metal prices of US$2,750/tonne Zn, US$2,100/tonne Pb, US$8,880/tonne Cu, US$1,850/oz Au, and US$23/oz Ag and recoveries of 90% Zn, 75% Pb, 70% Cu, 70% Ag, and 80% Au. AgEq* (g/t) = [Zn (%) x 47.81] + [Pb (%) x 30.43] + [Cu (%) x 119] + [Ag (g/t) x 1] + [Au (g/t) x 91.93]

West Tundra Long Section

* Equivalencies are calculated using ratios with metal prices of US$2,750/tonne Zn, US$2,100/tonne Pb, US$8,880/tonne Cu, US$1,850/oz Au, and US$23/oz Ag and recoveries of 90% Zn, 75% Pb, 70% Cu, 70% Ag, and 80% Au. AgEq* (g/t) = [Zn (%) x 47.81] + [Pb (%) x 30.43] + [Cu (%) x 119] + [Ag (g/t) x 1] + [Au (g/t) x 91.93]

Site Photos

Qualified Person under NI 43-101

Technical information on this page has been approved by Silver47 Exploration’s Vice President Exploration, Alex S. Wallis, P.Geo, a ‘Qualified Person’ as defined under Canadian National Instrument 43-101. Full disclosure is available on Silver47’s cautionary statements page.

Technical Report

Red Mountain VMS Property Technical Report

Effective Date: January 12, 2024

Latest news on Red Mountain

Silver47 Commences Fully Funded 10,000-Meter Drill Program at the Red Mountain Silver and Critical Minerals Project, Alaska

Silver47 Set to Commence Fully Funded 10,000-Meter Drill Program at the Red Mountain Silver and Critical Minerals Project, Alaska

Silver47 Discovers New High-Grade Massive Sulfide Zone at Red Mountain Project, Alaska

Silver47 Drills 606 g/t Silver Equivalent* over 9.65 m at the Silver-Rich Red Mountain Project, Alaska

No results found.

Explore Silver47

Hughes Project

Opportunity is waiting
in Nevada

Mogollon Project

Explore our past producing project in New Mexico

Investors

Everything you need to know
to start investing

Subscribe

Sign-up for future updates and news to stay up to date on all things Silver47.

View Transaction Presentation