TSX:BNKR

OTCQB:BHLL

Red Mountain Project

Alaska, USA

About Red Mountain

Red Mountain is a district-scale polymetallic opportunity with significant upside potential in Alaska’s Bonnifield Mining District, approximately 100 km south of Fairbanks. The combination of high-grade mineralization, favorable jurisdiction and, importantly, State managed lands make the Red Mountain Project ideal for development.

With an established mineral resource and a broad pipeline of exploration targets, the project offers significant potential for resource expansion and new discoveries within Bunker Hill’s U.S. portfolio.

Red Mountain brings significant silver and critical minerals growth potential to Bunker Hill's U.S. portfolio. Its established resource base and extensive exploration targets provide opportunities to expand known deposits and make new discoveries across Alaska's Bonnifield Mining District.

Galen McNamara

Bunker Hill Silver, President

Project Highlights

INFERRED

168.6 Moz AgEq*

Contained within 15.6 Mt

Average grade: 336 g/t AgEq*

2026 summer drilling completed; 4,136 metres across 14 holes and five targets to test resource expansion and new discovery potential

  • Location: Situated in Alaska, the leading silver-producing state in the U.S.
  • Mineralization: Silver occurs alongside zinc, lead, copper and gold in the project's polymetallic deposits 
  • Exploration Scale: More than 35 known mineralized prospects extend across a 60 km trend, with resources defined at Dry Creek and West Tundra Flats 
  • Growth Potential: Exploration targets resources expansion at Dry Creek and new discoveries beyond the existing deposits 

Equivalencies are calculated using ratios with metal prices of US$2,750/tonne Zn, US$2,100/tonne Pb, US$8,880/tonne Cu, US$1,850/oz Au, and US$23/oz Ag and recoveries of 90% Zn, 75% Pb, 70% Cu, 70% Ag, and 80% Au. AgEq* (g/t) = [Zn (%) x 47.81] + [Pb (%) x 30.43] + [Cu (%) x 119] + [Ag (g/t) x 1] + [Au (g/t) x 91.93]

Mineral Resource Estimates

Note:
1. The 2024 Red Mountain MRE was estimated and classified in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) “Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines” dated November 29, 2019, and the CIM “Definition Standards for Mineral Resources and Mineral Reserves” dated May 10, 2014.
2. Mr. Warren Black, M.Sc., P.Geo. of APEX Geoscience Ltd., a QP as defined by NI 43-101, is responsible for completing the 2024 Mineral Resource Estimate, effective January 12, 2024.
3. Mineral resources that are not mineral reserves have not demonstrated economic viability. No mineral reserves have been calculated for Red Mountain. There is no guarantee that any part of the mineral resources discussed herein will be converted to a mineral reserve in the future.
4. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, market, or other relevant factors.
5. The quantity and grade of reported Inferred Resources is uncertain, and there has not been sufficient work to define the Inferred Mineral Resource as an Indicated or Measured Mineral Resource. It is reasonably expected that most of the Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.
6. All figures are rounded to reflect the relative accuracy of the estimates. Totals may not sum due to rounding. Reported grades are undiluted.

7. A standard density of 2.94 g/cm³ is assumed for mineralized material and waste rock. Overburden density is set at 1.8 g/cm³. For mineralized material blocks with iron assays close enough to estimate an iron value for the block, density is calculated using the formula: density (g/cm³) = 0.0553 * Fe (%) + 2.5426.
8. Metal prices are US$2,750/tonne Zn, US$2,100/tonne Pb, US$8,880/tonne Cu, US$1,850/oz Au, and US$23/oz Ag.
9. Recoveries are 90% Zn, 75% Pb, 70% Cu, 70% Ag, and 80% Au.
10. ZnEQ (%) = [Zn (%) x 1] + [Pb (%) x 0.6364] + [Cu (%) x 2.4889] + [Ag (ppm) x 0.0209] + [Au (ppm) x 0.1923]
11. AgEQ (ppm) = [Zn (%) x 47.81] + [Pb (%) x 30.43] + [Cu (%) x 119] + [Ag (ppm) x 1] + [Au (ppm) x 91.93]
12. Open-pit resource economic assumptions are US$3/tonne for mining mineralized and waste material, US$19/tonne for processing, and 48° pit slopes.
13. Underground resource economic assumptions are US$50/tonne for mining mineralized and waste material and US$19/tonne for processing.
14. Open-pit resources comprise blocks constrained by the pit shell resulting from the pseudoflow optimization using the open-pit economic assumptions.
15. Underground resources comprise blocks below the open-pit shell that form minable shapes. They must be contained in domains of a minimum width of 1.5 m at Dry Creek or 3 m height at West Tundra Flats. Resources not meeting these size criteria are included if, once diluted to the required size, maintain a grade above the cutoff.

Located in Alaska, USA

The Red Mountain Project is situated on Alaska state-managed lands, free from Bureau of Land Management (BLM) or indigenous claims

  • Covering approximately 620 square kilometers of highly prospective geology
  • Alaska is host to several world class deposits and mines
  • 30-80 kilometers of highways, railways, and power, ensuring logistical efficiency and reduced development costs
  • Numerous multi million ounce VMS and polymetalic deposits offering multi-commodity potential

Ownership

Bunker Hill wholly owns 942 mineral claims and one mining lease, providing extensive exploration opportunities over a 60km trend in a mining-friendly region near established infrastructure

Historical Exploration

The Red Mountain Project area has a rich history of mineral exploration, with the first sulphide outcrop discovered in 1975. Ongoing exploration efforts continue to reveal the potential for further resource expansion, particularly in the Dry Creek and West Tundra 
Flats zones

Exploration & Development Strategy

Bunker Hill Silver is focused on further exploration of the Red Mountain Project to expand the current resource base and uncover new high-grade zones. The strategy includes:

Rapid Resource Growth

Focused on the Dry Creek and West Tundra Flats (WTF) zones

Targeting New Discoveries

Drilling to identify new silver-copper-gold mineralization

Advancing Towards Development

Fast-tracking the project to a development milestone and potential mine build

Dry Creek Long Section

*Equivalencies are calculated using ratios with metal prices of US$2,750/tonne Zn, US$2,100/tonne Pb, US$8,880/tonne Cu, US$1,850/oz Au, and US$23/oz Ag and recoveries of 90% Zn, 75% Pb, 70% Cu, 70% Ag, and 80% Au. AgEq* (g/t) = [Zn (%) x 47.81] + [Pb (%) x 30.43] + [Cu (%) x 119] + [Ag (g/t) x 1] + [Au (g/t) x 91.93]

West Tundra Long Section

*Equivalencies are calculated using ratios with metal prices of US$2,750/tonne Zn, US$2,100/tonne Pb, US$8,880/tonne Cu, US$1,850/oz Au, and US$23/oz Ag and recoveries of 90% Zn, 75% Pb, 70% Cu, 70% Ag, and 80% Au. AgEq* (g/t) = [Zn (%) x 47.81] + [Pb (%) x 30.43] + [Cu (%) x 119] + [Ag (g/t) x 1] + [Au (g/t) x 91.93]

Site Photos

Qualified Person under NI 43-101

Galen McNamara, P.Geo., the President & CIO of the Company, and a qualified person pursuant to NI 43-101, has reviewed and approved the scientific and technical information contained on this website. Mr. McNamara has verified the data disclosed herein, including sampling and drilling data underlying the technical information contained herein, by reviewing blanks, duplicates and certified reference material that the Company inserted into the sample stream and confirming that they fall within limits as determined by acceptable industry practice.

Technical
Report

Red Mountain VMS Property Technical Report

Effective Date: January 12, 2024

Latest News

on Red Mountain Project

September 8, 2026

Silver47 Drills Massive Sulfide at the New Second Chance Zone: 74 m of Visually Observed Semi-Massive to Massive Sulfide Intervals Within 197 m of Continuous Sulfide Mineralization, Red Mountain Project, Alaska

June 12, 2026

Silver47 Commences Fully Funded 10,000-Meter Drill Program at the Red Mountain Silver and Critical Minerals Project, Alaska

June 4, 2026

Silver47 Set to Commence Fully Funded 10,000-Meter Drill Program at the Red Mountain Silver and Critical Minerals Project, Alaska

More on Bunker Hill

Bunker Hill Project

Discover the vision behind Bunker Hill and what makes this project unique. Explore the development and its potential.

Team

Get to know the people behind Bunker Hill. Learn more about the experience, expertise, and vision driving the project forward.

Investors

Discover everything you need to know about investing in Bunker Hill, including the opportunity and potential.

Newsletter Sign Up

Sign-up to follow our journey with news, events, and updates delivered straight to your inbox.

Corporate Presentation

Explore our vision, strategic assets, and growth opportunities in U.S. silver and critical minerals.